Skip to content The Trail Center

Alum Rock Park Work Day Report – Apr. 22, 2017

Project: Alum Rock Park - City of San Jose

Photo Albums: 1704 Alum Rock Park and 1703-26 Alum Rock Scouting

On Saturday, April 22, we returned to Alum Rock Regional Park to work on the South Rim Trail switchbacks above the confluence of North Penitencia and Arroyo Aguague Creeks. The trail has been closed due to slide damage and a large downed tree and root ball across the trail. (Original plans were to return to Sycamore Switchbacks Trail to complete the work begun on December 6, 2016, but two severe slides during the winter storms now require major engineering and reroute of the trail, and Sycamore will remain closed for the foreseeable future.)

The weather was mostly clear, with temperatures in the 50’s at the outset and in the high 60’s when the workday ended. Following winter rains, the soil was quite workable. The work area was almost entirely under tree cover.

Volunteers parked in the Youth Science Institute lot, and Ranger Huy opened the gate to allow Dave C with the tool trailer access to the staging area at Sycamore Picnic Grove, immediately adjacent to the Sycamore Switchbacks trailhead.

Approximately 30 volunteers helped make the day a success. Dave Kison and Ranger Valerie greeted the arrivals in the parking lot, distributing parking passes and collecting sign-in sheets before directing them down the ½ mile Penitencia Creek Trail to the base of the switchbacks. After another ¾ mile hike to the top of the South Rim Trail switchbacks, the work began. Aaron’s crew had the upper portion of the trail, brushing and widening the overgrown tread, removing outside berms, defining the inside bench, brushing overhead, and adding a couple drain drips. What a difference! Dave C’s crew (the Earthmovers) cut the trail into the hillside to divert around a slide (undercut by a fallen tree), improved the ramp onto SJ Park’s engineered solution through a tree root ball (where same tree had come to rest), and opened a scenic vista at a switchback where fallen trees had blocked the view and posed head hazards. The scope for Larry’s crew included brushing, definition of inside bench, inside drains at switchbacks, new drain dips, and one awesomely beautiful new viewpoint. The top of the trail served up a spectacular panorama for lunch, complete with a view of MC Hammer’s house (maybe).

The Trail Center believes that the trail can now be opened to hikers. Ranger Mike is considering what work the City may want to complete prior to opening (road grader removal of rock slide on Penitencia Creek Trail and possible improvements to a large retaining wall at the lowest end of the switchbacks). The Trail Center is also considering a return to Alum Rock later this year to complete the lighter work on the lower half of the switchbacks and to add a retaining wall to the aforementioned trail diversion.

Bill Farrell
4/22/2017